![]() ![]() Details regarding this project can be found under the "Documents" tab. Department of Agriculture (USDA) Rural Utilities Service (RUS) is retracting the notice of the availability that was published last week for the Cardinal-Hickory Creek 345-kilovolt (kV) Transmission Line Project (C-HC Project) Draft Supplemental Environmental Assessment (EA). 18-001Title345 kV Transmission Line Project (Gerald Gentleman Station to Thedford and Thedford to Holt County) "R-PROJECT"Bids Due Date/Time 2:00:00 PM Central Contact Sarah Hopwood Tel 402 563-5405 Fax 402 563-5034 Project Manager Lynn Guilliatt Tel 402 563-5350 Fax 402 563-5034 Description Nebraska Public Power District (DISTRICT) intends for the CONTRACTOR to provide all design, materials and equipment, including, but not limited to, tubular steel monopoles, tubular steel H-frames and lattice steel towers, helical pier foundations, wire, drilled pier foundations, insulators, hardware, machinery, tools, labor, supervision, transportation, performance bond, and any other items not furnished by the DISTRICT, in strict accordance with the drawings and specifications for the construction of approximately 225 miles single circuit 345 kV Transmission Line Project from the DISTRICT’S existing Gerald Gentleman Station (GGS) Substation located south of Sutherland, Nebraska, to the expanded Thedford Substation located east of Thedford, Nebraska and from Thedford Substation to the new Holt County Substation located southwest of Clearwater, Nebraska. A 345 KV TRANSMISSION LINE PROJECT About the Project The 20-mile, 345 kV Empire State Line travels through Erie and Niagara counties to enable greater utilization of renewable energy from the Robert Moses Niagara Hydroelectric Power Plant and electricity imports from Ontario, Canada.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |